ZONING BOARD OF APPEALS REGULAR MEETING -THURSDAY DECEMBER 10 AT 8PM
3222010_65051_0.jpg
VILLAGE OF HASTINGS-ON-HUDSON
ZONING BOARD OF APPEALS MEETING
THURSDAY, DECEMBER 10, 2015 - 8PM

Meeting will be broadcast live on WHOH-TV  75 or FIOS 43 and http://whoh-tv.org

A Meeting of the Zoning Board of Appeals will be held on Thursday, December 10, 2015 at 8:00 P.M., in the Meeting Room, Municipal Building, 7 Maple Avenue, Hastings-on-Hudson, New York.  

AGENDA

Angus Chen & Megan Foley
21 Elm Place

Relief from the strict application of the Village Code Sections 295-69F.1.c and 295-69F.2.a (1) & (2), for construction of a new two-story rear addition and rear entrance at their home at 21 Elm Place.  Said property is in the R-7.5 Zoning District and is also known as SBL: 4.40-35-11 on the Village Tax Maps.

Non-conformity details of the proposed addition and rear entrance are as follows:
Side Yards:  Each side – Existing – 11.10 ft./2.7 ft.; Proposed – 19.7 ft./2.2 ft. ft.; Required Min. - 12 ft/8 ft. {295-69F.1.c.}; Variance requested – 5.8 ft. Side #2
Building Coverage:  Existing – 35.18%; Proposed – 40%; Required Max. – 30% {295-69F.2.a(1)}; Variance requested – 10%
Development Coverage:  Existing – 57.46%; Proposed – 57.04%; Required Max. – 40% {295-69F.2.a(2)}; Variance requested – 17.04% (number is reduced due to removal of impervious walkways)



CCI Properties Inc.
32-34 Washington Avenue

Relief from the strict application of Village Code Sections 295-18.B, 295-72.E.2, 295-20.C & 295-41.B, for the construction of an additional building containing 5 townhouse units on their property at 32-34 Washington Avenue.  Said property in MR-1.5 Zoning District and is known as SBL: 4.70-53.11 on the Village Tax Maps.

Variances sought are as follows:

1.      Different uses on a single lot:  Existing use – two-family; Proposed use – two-family and a multi-family dwelling; Permitted – one use {295-18.B}; Variance required for one additional use.
2.      Lot coverage:  Existing – 12%; Proposed – 40.7%; Maximum Permitted – 15% {295-72.E.(2)}; Variance required – 25.7% coverage.
3.      Paving and structures in required yards:  Proposed – parking spaces for existing structure in the required yard {295-20.C}; Variance required – four parking spaces in the required yard.
4.      Maximum width of curb cuts:  Existing – one curb cut 10’ wide; Proposed – two curb cuts 26’ wide total; Maximum permitted – two curb cuts 24’ wide total {295-41.B}; Variance required – 2’ over allowable curb cut.


Discussion Item
Proposed Local Law E of 2015 – Gateway Cluster Overlay District


Approval of Minutes
Regular Meeting, October 22, 2015
Special Meeting, November 5, 2015


Announcements
Next Meeting Date – January 28, 2016



PLEASE NOTE: All applications and plans are available for review at the Building Department, 7 Maple Ave


For information regarding access for persons with disabilities, please visit http://hastingsgov.org or call 914-478-3400


Village of Hastings-on-Hudson
7 Maple Ave, Hastings-on-Hudson, NY 10706
web:    http://Hastingsgov.org               
 
VILLAGE CALENDAR               PUBLIC WORKS CALENDAR

 
 
STAY CONNECTED! DOWNLOAD ALL OF OUR SMARTPHONE APPS HERE:
Village of Hastings on Hudson (ANDROID / ITUNES)
WHoH-TV (ANDROID/ITUNES)

TO SUBSCRIBE OR UNSUBSCRIBE GO TO http://hastingsgov.org/subscriber

The Hastings-on-Hudson Technology Department asks that you consider the environment before printing this e-mail.