March 28, 2019 Zoning Board Meeting
»
Call to Order - A Meeting of the Zoning Board of Appeals will be held on Thursday, March 28, at 8:00 P.M., in the
Meeting Room, Municipal Building, 7 Maple Avenue, Hastings-on-Hudson, New York.
Call to Order
A Meeting of the Zoning Board of Appeals will be held on Thursday, March 28, at 8:00 P.M., in theMeeting Room, Municipal Building, 7 Maple Avenue, Hastings-on-Hudson, New York.
»
Case No. 06-19 - Amanda & Joe Kupillas
12 Maple Lane
For approval of View Preservation, as required under section 295-82 and relief from the strict application of the Village Code Sections 295-55A & 295-70E.2.a&c, for an addition of a 3rd floor roof dormer & extension of an existing 2nd floor porch to their two-family dwelling located at 12 Maple Lane. Said property is located in the 2R Zoning District and is known as SBL: 4.30-21-5 on the Village Tax Maps.
Non-conformity details are as follows:
Prohibition against extension of nonconformity – with relation to Front and Side Yard Setbacks for the roof dormer and 2nd floor porch. {295-55A}
Front Yard Setback to Dormer: Existing – 17.8 ft.; Proposed – 17.8 ft.; Required – 30 ft. {295-70E.2.a & 295-55A}; Variance Required – 12.2 ft.
Side Yard Setbacks to Dormer and 2nd Floor Porch: Each yard/total of both – Existing: Side 1 – 1.7 ft./Side 2 – 2.8 ft./Both – 4.5 ft.; Proposed: Side 1 – 1.7 ft./Side 2 – 2.8 ft./Both – 4.5 ft.; Required: Side 1 – 12 ft./Side 2 – 18 ft./Both – 30 ft. {295-70E.2.c & 295-55A}; Variance Required: Side 1 – 10.3 ft./Side 2 – 15.2 ft./Both – 25.5 ft.
Case No. 06-19
Amanda & Joe Kupillas12 Maple Lane
For approval of View Preservation, as required under section 295-82 and relief from the strict application of the Village Code Sections 295-55A & 295-70E.2.a&c, for an addition of a 3rd floor roof dormer & extension of an existing 2nd floor porch to their two-family dwelling located at 12 Maple Lane. Said property is located in the 2R Zoning District and is known as SBL: 4.30-21-5 on the Village Tax Maps.
Non-conformity details are as follows:
Prohibition against extension of nonconformity – with relation to Front and Side Yard Setbacks for the roof dormer and 2nd floor porch. {295-55A}
Front Yard Setback to Dormer: Existing – 17.8 ft.; Proposed – 17.8 ft.; Required – 30 ft. {295-70E.2.a & 295-55A}; Variance Required – 12.2 ft.
Side Yard Setbacks to Dormer and 2nd Floor Porch: Each yard/total of both – Existing: Side 1 – 1.7 ft./Side 2 – 2.8 ft./Both – 4.5 ft.; Proposed: Side 1 – 1.7 ft./Side 2 – 2.8 ft./Both – 4.5 ft.; Required: Side 1 – 12 ft./Side 2 – 18 ft./Both – 30 ft. {295-70E.2.c & 295-55A}; Variance Required: Side 1 – 10.3 ft./Side 2 – 15.2 ft./Both – 25.5 ft.
»
Approval of Minutes & Announcements - Approval of Minutes
Regular Meeting – February 28, 2019
Announcements
Next Meeting Date – April 25, 2019
Approval of Minutes & Announcements
Approval of MinutesRegular Meeting – February 28, 2019
Announcements
Next Meeting Date – April 25, 2019